Anhui Uniform Trading Co.Ltd ahuniform@live.com 15255120126-15255120126
Product Details
Place of Origin: CHINA
Brand Name: UNIFORM
Certification: SGS,CE,ISO9001
Model Number: AUTC-AWG-M022
Payment & Shipping Terms
Minimum Order Quantity: Negotiable
Price: Negotiable
Packaging Details: Carton box, Customized
Delivery Time: 25-30 days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 100,000Pairs/Month
Material: |
Flame Retardant Fabric, Leather |
Size: |
12x25cm Or Custom |
Packing: |
12 Pairs/bag |
Service: |
OEM / ODM |
Feature: |
Heat Resistant, Durable, Anti-slip, Waterproof |
Certification: |
EN388 |
Application: |
Fire Fighting, Forest Fire Prevention |
Weight: |
102g |
Color: |
Orange |
Material: |
Flame Retardant Fabric, Leather |
Size: |
12x25cm Or Custom |
Packing: |
12 Pairs/bag |
Service: |
OEM / ODM |
Feature: |
Heat Resistant, Durable, Anti-slip, Waterproof |
Certification: |
EN388 |
Application: |
Fire Fighting, Forest Fire Prevention |
Weight: |
102g |
Color: |
Orange |
Forest Fire Prevention and Flame Retardant Protective Gloves
Product feature
Aramid fabric: continuous burning time≤1s, smoldering time≤1s; Damaged length≤50mm; TPP>250kW.s/㎡; Breaking strength: warp
direction ≥1100N, weft direction ≥1000N; Tear strength: ≥100N, weft ≥100N. The formaldehyde content is ≤75mg/kg. Overall thermal
stability (260℃±5℃): After 5min thermal stability test, there is no melting or dripping. Dimensional change rate after 50
washings: ±2.5%. Color fastness after washing for 50 times: light fastness ≥ grade 4, washing resistance (discoloration/staining)
≥ grade 4, water resistance (discoloration/staining) ≥ grade 4, sweat resistance (discoloration/staining) ≥ grade 4, moisture
resistance Friction ≥3 level. Reflective tape: Use flame-retardant reflective tape, the value of the retroreflective coefficient
must meet the requirements of GB 20653-2006; the thermal stability of the reflective tape (260℃±5) ℃ environment, after 5min
thermal stability test, the surface will not be carbonized or peeled off
![]()
![]()
Packaging & Delivery
Packaging Details:1 Pair Packed in a Polybag,10 Pairs Packed in Inner Box,10 Boxes Packed in a Carton
Port:Shanghai and Ningbo
Lead Time:About 25-30 days after payment